Woodin Avenue Bridge Rehabilitation

Chelan, Washington

  • Services Bridge Engineering, Civil Engineering
  • Market(s) Bridges, Natural Environments, Roadway
  • Awards 2020 APWA Project of the Year
    2020 WSDOT Award of Excellence
  • Owner City of Chelan
  • Contractor Selland Construction
  • Collaborators SCJ Alliance
  • Team Seattle, WA
Woodin Avenue Bridge Rehabilitation

Facts about the Project:

  • Bridge was converted from 2-lanes of vehicle traffic to a single lane with wider sidewalks and a bike lane while maintaining existing footprint.
  • Repair work was time to coincide with lake’s summer water elevation rise to utilize a floating barge to perform the work.
  • To not impact structural integrity of the bridge, the team developed an ultra-light sidewalk consisting of geofoam topped with lightweight concrete.
  • Exact replica concrete light posts were precast in a controlled environment away from the bridge.

 

Woodin Avenue Bridge Rehabilitation

All Projects

Browse our portfolio to learn more about the breadth of our experience.

Woodin Avenue Bridge Rehabilitation

Let's Connect

Discover more about our many teams and what makes them unique.