Chelan, Washington
Construction/Project Management, Structural Engineering
Bridges, Roadway
Slide Ridge produces frequent and violent flows of varying amounts of water, soil, boulders and debris down a natural and manmade drainage channel, frequently overtopping the South Lakeshore Road on the west side of Lake Chelan. The project team evaluated the hydraulic conditions of the existing channel from the apex of the Slide Ridge alluvial fan to Lake, evaluating the feasibility of replacing an existing 96-inch culvert with a new opening and making local modifications to the basin and channel. A feasibility study identified several alternative solutions and the benefits and risks associated with the alternatives. The final solution included raising of the roadway several feet, in addition to lowering and enlarging the channel A single span deck bulb tee bridge supported on spread footings carries the roadway over the new channel.